20.06.2019
This is the second Ariane 5 launch in 2019 Three more Ariane 5 launches are scheduled between now and the end of the year The Ariane launcher will celebrate its 40th anniversary on December 2019
For its second launch of the year, Ariane 5 successfully placed two telecommunications satellites, T-16 and EUTELSAT 7C, into geostationary transfer orbit (GTO), from the European spaceport in Kourou (French Guiana).
ArianeGroup is the industrial lead contractor for the development and deployment of Ariane 5 and Ariane 6 launchers. The company coordinates an industrial network of more than 600 companies (including 350 SMEs) in 13 European countries. ArianeGroup oversees the entire industrial supply chain, from performance optimization and the corresponding studies associated with the Ariane 5 to production, from the supply of mission-specific data and software to the marketing of the launcher through Arianespace. This chain includes equipment and structures, engine manufacturing, integration of the various stages and finally launcher integration in French Guiana.
The total performance required of the Ariane 5 launcher was 10,594 kg, of which the two satellites accounted for 9,736 kg. The payloads were injected into an orbit inclined 6° in relation to the equator.